Solar Installations
- Consult a Renewable Energy Installer: Begin by speaking with a renewable energy installer. You can find a list of qualified installers in the Preferred Partner Directory provided by Efficiency Nova Scotia.
- Request a 12-month Consumption Report from Berwick Electric: Your plans estimated generation must not exceed the 12-month consumption total.
- Discuss Options and Design: Your chosen installer will review the available options and work with you to design a system tailored to your specific needs.
- Submit a Development Permit Application: A Development Permit Application must be submitted to the Planning Department of the Berwick Town Hall.
- Submit a Net Metering Application: Once the development permit has been approved, you will need to submit the Net Metering Application to the Berwick Electric Commission for review and approval.
- Await Approval of Your Net Metering Application: Once the plan has been reviewed by the engineer, you will be notified by the Berwick Electric Commission to proceed with the next steps.
- Once Notified of Approval, pull a Wiring Permit: The installer is required to pull a Wiring Permit before installation can begin.
- Begin Installation: Once steps 1-7 have been completed, the installer can proceed with the installation of your system.
- Conduct On-Site Inspections: During the installation process, your installer will arrange for the necessary on-site electrical Inspection, including rough-in and final inspections.
- Energize the System: Following successful inspections and acceptance of the electrical installation, your installer will energize the system.