Solar Installations

  1. Consult a Renewable Energy Installer: Begin by speaking with a renewable energy installer. You can find a list of qualified installers in the Preferred Partner Directory provided by Efficiency Nova Scotia.    
  2. Request a 12-month Consumption Report from Berwick Electric: Your plans estimated generation must not exceed the 12-month consumption total.    
  3. Discuss Options and Design: Your chosen installer will review the available options and work with you to design a system tailored to your specific needs.
  4. Submit a Development Permit Application: A Development Permit Application must be submitted to the Planning Department of the Berwick Town Hall.
  5. Submit a Net Metering Application: Once the development permit has been approved, you will need to submit the Net Metering Application to the Berwick Electric Commission for review and approval.
  6. Await Approval of Your Net Metering Application: Once the plan has been reviewed by the engineer, you will be notified by the Berwick Electric Commission to proceed with the next steps.
  7. Once Notified of Approval, pull a Wiring Permit: The installer is required to pull a Wiring Permit before installation can begin.
  8. Begin Installation: Once steps 1-7 have been completed, the installer can proceed with the installation of your system.
  9. Conduct On-Site Inspections: During the installation process, your installer will arrange for the necessary on-site electrical Inspection, including rough-in and final inspections.
  10. Energize the System: Following successful inspections and acceptance of the electrical installation, your installer will energize the system.